Diaphragm Wall Projects - Asia
Project: Plaza Rakyat
Location: Kuala Lumpur, Malaysia
Date: 1994
Contractor: Bauer Malaysia
Excavations: 160 Panel diaphragm wall and 63 bored piles
Conditions: Sand and clay
KB Products: SlurryPro CDP, MPA, LA-1, KobbleBlok, InstaFreeze and ProTek -100
Project: Scotts Road
Location: Singapore
Date: 1996
Contractor: L&M Foundation Specialists Pte. Ltd.
Excavations: 90 Diaphragm walls (0.6m x 4.8m x 33m and 0.8mx 5.4m x 36m) and
280bored piles (0.7m-1.2m x 43m).
Conditions: Sand and clay
KB Products: SlurryPro CDP, MPA, LA-1 and ProTek -100, WeightIt
Project: Chung-Chen Road
Location: Kaoh Siung
Date: 2Q-1995
Contractor: An-Hui
Excavations: Diaphragm wall, panels 0.8 x 30m, perimeter 490 meters
Conditions: Fine sand, medium clay and brackish ground water.
KB Products: SlurryPro LSC, MPA, LA-1 and ProTek -100, WeightIt
Project: Au-Tzu-De
Location: Kaoh Siung
Date: 4Q-1994
Contractor: An-Hui
Excavations: Diaphragm wall, panels 0.7 x 23m, perimeter 110 meters
Conditions: Fine sand and medium clay
KB Products: SlurryPro LSC, MPA, LA-1 and ProTek -100
Project: Phoenix Mt.
Location: Kaoh Siung
Date: 3Q-1993
Contractor: An-Hui
Excavations: Diaphragm wall, panels 0.7 x 20m, perimeter 100 meters
Conditions: Fine sand and medium clay
KB Products: SlurryPro LSC, MPA, LA-1 and ProTek -100
Project: Wu-Chi
Location: T’ainan, Taiwan
Date: 3Q-1993
Contractor: An-Hui
Excavations: Diaphragm wall, panels 0.7 x 32m, perimeter 440 meters
Conditions: Fine sand, medium clay and brackish ground water
KB Products: SlurryPro LSC, MPA, LA-1 and ProTek -100
Project: De-Chung-Hai
Location: T’ainan, Taiwan
Date: 2Q-1995
Contractor: Jing-Yu
Excavations: Diaphragm wall, panels 0.7 x 22m, perimeter 110 meters
Conditions: Fine sand, medium caly, seawater
KB Products: SlurryPro CDP, MPA, LA-1 and ProTek -100, WeightIt, InstaFreeze and
InstaFreeze C-2
Project: Lin-Sheng Road
Location: T’ainan, Taiwan
Date: 1Q-1995
Contractor: Jing-Yu
Excavations: Diaphragm wall, panels 0.8 x 28m, perimeter 400 meters
Conditions: Fine sand, medium clay
KB Products: SlurryPro CDP, MPA, and ProTek -100
Project: King-Hwa Road
Location: T’ainan, Taiwan
Date: 3Q-1995
Contractor: Jing-Yu
Excavation: Diaphragm wall, panels 0.5 x 20m, perimeter 70 meters
Conditions: Fine sand and medium clay
KB Products: SlurryPro CDP, MPA, and ProTek -100
Project: Fu-Shin Road
Location: Kaohsiung, Taiwan
Date: 4Q-1994
Contractor: Jing-Yu
Excavation: Diaphragm wall, panels 0.7 x 28m, perimeter 320 meters
Conditions: Fine sand and medium clay
KB Products: SlurryPro LSC, MPA, and ProTek -100
Project: Go-Bei Road
Location: Kaohsiung, Taiwan
Date: 4Q-1993
Contractor: Jing-Yu
Excavation: Diaphragm wall, panels 0.7 x 28m, perimeter 100 meters
Conditions: Fine sand and medium clay
KB Products : SlurryPro LSC, and ProTek -100
Project: Santo Road
Location: Kaohsiung, Taiwan
Date: 1Q-1996
Contractor: Jing-Yu
Excavation: Diaphragm wall, panels 0.7 x 26m, perimeter 280 meters
Conditions: Sand and medium clay
KB Products: SlurryPro LSC, MPA, , LA-1 and ProTek -100
Project: Park Avenue
Location: Pin-Tong
Date: 1Q-1995
Contractor: Jing-Yu
Excavation: Diaphragm wall, panels 0.7 x 28m, perimeter 300 meters
Conditions: Fine sand and small pebbles
KB Products: SlurryPro LSC, MPA, LA-1 and ProTek -100
Project: Chen-Kuo Road
Location: Pin-Tong
Date: 4Q-1995
Contractor: Jing-Yu
Excavation: Diaphragm wall,panels 0.7 x 26m, perimeter 1751 meters
Conditions: Fine sand
KB Products: SlurryPro LSC, MPA, LA-1 and ProTek- 100
Project: Nei-Hu
Location: Taipei
Date: 2Q-1995
Contractor: Saint-Lu
Excavation: Diaphragm wall, panels 0.7 x 28m, perimeter 360 meters
KB Products: SlurryPro LSC, MPA, LA-1 and ProTek -100
Project: Shie-Lin
Location: Taipei
Date: 2Q-1995
Contractor: Saint-Lu
Excavation: Diaphragm wall, panels 0.7 x 26m, perimeter 185 meters
Conditions: Fine sand and medium clay
KB Products: SlurryPro LSC, MPA, LA-1 and ProTek- 100
Project: Da-Zue
Location: Taipei
Date: 4Q-1995
Contractor: Saint-Lu
Excavation: Diaphragm wall, panels 0.7 x 22m, perimeter 212 meters
Conditions: Fine sand
KB Products: SlurryPro LSC, MPA, ProTek -100
Project: King-Do
Location: Taipei
Date: 3Q-1996
Contractor: Saint-Lu
Excavation: Diaphragm wall, panels 1.0 x 32m, perimeter 425 meters
Conditions: Fine sand and medium clay
KB Products: SlurryPro LSC, MPA, ProTek -100
Project: Pan-Chiao
Location: Taipei
Date: 3Q-1995
Contractor: Saint-Lu
Excavation: Diaphragm wall, panels 0.7 x 33m, perimeter 260 meters
Conditions: Fine sand and medium clay
KB Products: SlurryPro LSC, MPA, ProTek -100
Project: Nan-Kong
Location: Taipei
Date: 3Q-1995
Contractor: Ever Lasting Building Co.
Excavation: Diaphragm wall, panels 0.7 x 26m, perimeter 189 meters
Conditions: Fine sand and medium clay
KB Products: SlurryPro LSC, MPA, ProTek -100
Project: Bo-Ai Road
Location: Taipei
Date: 4Q-1994
Contractor: Ever Lasting Building Co.
Excavation: Diaphragm wall, panels 0.7 x 28m, perimeter 196 meters
Conditions: Fine sand and medium clay
KB Products: SlurryPro LSC, MPA, ProTek -100
Project: Chung-Ho
Location: Taipei
Date: 4Q-1993
Contractor: Ground Engineering Co.
Excavation: Diaphragm wall panels 0.7 x 19m, perimeter 196 meters
Conditions: Fine sand and gravel
KB Products: SlurryPro LSC, MPA, LA-1, KobbleBlok, ProTek- 100
Project: Ching-Mei
Location: Taipei
Date: 3Q-1994
Contractor: Ground Engineering Co.
Excavation: Diaphragm wall, panels 0.7 x 28m, perimeter 126 meters
Conditions: Sand and medium clay
KB Products: SlurryPro LSC, MPA, ProTek -100
Project: Si-Tzu
Location: Taipei
Date: 3Q-1994
Contractor: Ground Engineering Co.
Excavation: Diaphragm wall, panels 0.7 x 28m., perimeter 595 meters
Conditions: Fine sand and gravel
KB Products: SlurryPro PHPA, MPA, LA-1, InstaFreeze, KobbleBlok, ProTek- 100