|

The
Salt River
Bridge in
Phoenix,
AZ was built for use in the ‘monsoon’ season between July and September. KB International was brought in on the project by Case Foundation in 2007. The main product used was SlurryShield PBS and KB staff was on-site throughout the drilling to assist with unforeseen soil conditions. The bridge was opened to traffic in 2008.


The new bridge was constructed next to the old bridge to reduce damage to the environment and reduce the amount of road work needed.
|